A crane is the most sought construction equipment. It is required in almost every other project. A crane is basically, dedicated to lifting and moving the heaviest object on construction sites. They are available in different sizes depending on the capacity of load they can lift. But do you ever get bothered with the deprived capability of a crane? It is because the capability of the crane declines due to neglected maintenance and other care.
In this article, we have gathered, after a delve research, some pro tips to increase the weight lifting capacity of crane.
-
Look for the optimal weather
A crane performs best during favorable and ideal weather. It is a little strange but it is true. The weight of the load can be greatly impacted by the weather condition. When you are dealing with heavy loads, it is suggested to know about the nature of it. Some materials get influenced by the wet and dry weather.
-
Elevate the crane’s parts
You can ask for help from the best deal equipment provider or a supplier to upgrade your crane’s parts. They will look at the weight you need to lift and then elevate the required part to upgrade them. This way, your crane will be capable of lifting more weight than they usually do. This upgradation may take time, so schedule it before landing on the job site.
-
Strengthen the jib crane support
The individual parts up-gradation is only possible for a freestanding crane whereas it could not be possible for a job crane. In this case, you need to reinforce the support of a jib crane so that it can lift more weight under its capacity.
-
Do not use below-the-hook devices
Below-the-hook devices are actually, different attachments that are connected to the beam of a crane. These frequent attachments and detachments of the tools can minimize the capability of a crane. You should avoid using them, instead, you can use the crane itself for lifting the loads.
-
Use other cranes
In the situation when you need to use a below-the-hook attachment, you can opt to use two cranes. It will not let you compromise the capacity of crane. The loads can be attached to the beam of a different crane.
-
Keep an eye on the duty cycle
Do not overuse the crane. It is suggested to keep a strict eye on the usage of crane. If it is being used more than its capacity then you should immediately give it a repair and maintenance break. The on-time maintenance will keep the crane’s capacity up to the mark.
-
Rent a crane
When you need to carry and lift the heaviest loads, then you should hire another crane having a larger capacity for lifting a load. Using your existing crane and putting a burden on it will deprive its capacity before its life span. Find the supplier who provides the “best deal equipment” under your budget.
Conclusion
A crane is wonderful heavy equipment used on the construction site. It is used in most construction projects to lift and move the heaviest loads. In this article, we have mentioned a few tips to boost the capacity of your crane. Follow the tips and increase the lifting capacity of yours crane.